SWConsult were engaged to provide a technical specification for Podium and Pool Waterproofing which included extensive refurbishment of the surrounding areas of both the internal and the external pool and spa areas.

Pre-existing construction (1980 finishes)

Demolition commences.

Removal of structural up-stand beam. Pool back-propped awaiting replacement carbon fibre reinforcement.

Pool up-stern formed and poured.

Pool membrane complete.

Pool tiling complete.
Recent Comments