by Stephen Waite | May 25, 2016 | Uncategorized
We were engaged after the Body Corporate became concerned that the Contractor they had engaged for balustrade replacement was not diligently carrying out the Works they had been contracted to do. After the Contractor threatened to pull off site we were able to...
by Stephen Waite | May 10, 2016 | Uncategorized
Builders Warranty Defects Liability Don’t be caught out and miss the deadline to get any defects rectified by the Builder. Body Corporates have responsibility to ensure that Owners are not faced with expensive remedial costs for defects that have been noticed...
by Stephen Waite | Feb 24, 2016 | Uncategorized
Example of concrete cancer beginning to undermine balcony and balcony rails. It is vital when apartment owners incorporate a Maintenance Schedule any works needed to treat concrete cancer are specified by an Engineer and carried out as soon as possible by a...
by Stephen Waite | Feb 9, 2016 | Uncategorized
Flange type fitting to enable suitable connections. New dedicated air-con pipe fixed to facade to services. All new and existing air-conditioners. Balustrade re-painting continues Balustrade re-painting continues Balcony rails...
by Stephen Waite | Aug 19, 2015 | Uncategorized
Back in 1998, we were involved in removal of corroding balustrade post embediments. The project involved structural extraction by diamond blade cutting of the balustrade post embediments and replacing the connection to the slab with enlarged base plates to avoid the...
by Stephen Waite | Feb 16, 2015 | Uncategorized
The Builder of a low rise residential structure failed to suitably construct balconies to enable proper waterproofing. During re-construction and re-waterproofing termite infestation was discovered requiring additional structural repairs. The moral of the story is...